News Updates Friday 22nd Feb 2019 :
  • Welcome to INPRESSCO, world's leading publishers, We have served more than 10000+ authors
  • Articles are invited in engineering, science, technology, management, industrial engg, biotechnology etc.
  • Paper submission last date of Jan/Feb 2019 is 23 Feb 2019, Submit online or at editor.ijcet@inpressco.com
  • Our journals are indexed in NAAS, University of Regensburg Germany, Google Scholar, Cross Ref etc.
  • DOI is given to all articles

A Comparative Delay Analysis of Copper Interconnect with Future Candidate CNT


Author : Tarun Parihar, Abhilasha Sharma and Dhanshri Parihar

Pages : 606-610
Download PDF
Abstract

 
Development in VLSI technology leads to various futuristic possibilities as well as various design challenges for ICs. With a pace of time technology of copper interconnect suffers from various problems such as power dissipation, delay, cross talk etc. In order to meet the demand of futuristic technology of interconnects a promising alternative solution comes out to be carbon nanotube (CNT). In this paper a comparative analysis is made to investigate the problems of interconnect that are facing by current technology i.e. copper interconnect and to identify its alternative solution scope for the interconnect problem by comparative analysis. In this paper traditional copper interconnects are compared to new innovative interconnect that is made by bundles of single wall carbon nanotubes. The delay the performance of the CNT –bundle and copper interconnects was compared respectively at local, intermediate and global lengths.

Keywords: Interconnect, Copper (Cu), Carbon Nanotube (CNT), Single wall Carbon Nanotube (SWCNT),Multi wall Carbon nanotube(MWCNT),Resistance Capacitance(RC)

Article published in International Journal of Current  Engineering  and Technology, Vol.3,No.2 (June- 2013)

 

 

 

Call for Papers
  1. IJCET- Jan/Feb 2019 Issue

    Submission Last Date
    23 Feb
  2. DOI is given to all articles
  3. Current Issue
  4. IJTT-March-2019
  5. IJAIE-March-2019
  6. IJCSB-March-2019
  • Inpressco Google Scholar
  • Inpressco Science Central
  • Inpressco Global impact factor
  • Inpressco aap

International Press corporation is licensed under a Creative Commons Attribution-Non Commercial NoDerivs 3.0 Unported License
©2010-2018 INPRESSCO® All Rights Reserved