News Updates Thursday 26th Dec 2024 :
  • Welcome to INPRESSCO, world's leading publishers, We have served more than 10000+ authors
  • Articles are invited in engineering, science, technology, management, industrial engg, biotechnology etc.
  • Paper submission is open. Submit online or at editor.ijcet@inpressco.com
  • Our journals are indexed in NAAS, University of Regensburg Germany, Google Scholar, Cross Ref etc.
  • DOI is given to all articles

Utilization of Cranes in Mega Construction Project


Author : Khushal D Patil and P P Bhangale

Pages : 1444-1449
Download PDF
Abstract

Tower crane are commonly constitute of bottleneck production for today’s typical building construction project. If we reduce the cycle period of crane cycle we can increase the productivity. This case study deals with the factor affecting the cycle period and how they can be optimize. Two operating mode have been studied. Cab operating mode and remote operating mode and there advantages and disadvantages. This study also identified that it is the balance between fast travel part of the cycle and the professional who are charged with the fast of selection the operation mode (OM). Best suit for the project when both operating systems are optional.

Keywords: Tower Crane, Crane Operation, Cycle Time, Cab and Remote mode.

Article published in International Journal of Current Engineering and Technology, Vol.6, No.4 (Aug-2016)

 

Call for Papers
  1. IJCET- Current Issue
  2. Issues are published in Feb, April, June, Aug, Oct and Dec
  3. DOI is given to all articles
  • Inpressco Google Scholar
  • Inpressco Science Central
  • Inpressco Global impact factor
  • Inpressco aap

International Press corporation is licensed under a Creative Commons Attribution-Non Commercial NoDerivs 3.0 Unported License
©2010-2023 INPRESSCO® All Rights Reserved