Work Sampling to improve Labour Utilization of Fabrication Shop
Pages : 1400-1408
Download PDF
Abstract
Work Sampling study performed to determine the labour utilization of fabrication shop within objective to improve the productivity. Work sampling has been used to indirectly measure crew productivity. Although favored for being less costly, easy to adopt, and able to provide quick information. In this study, the work sampling performed in the regular shift from 8:30AM to 5:00PM
Keywords: Work Sampling, Labour utilization, Team size, work sampling
Article published in International Journal of Current Engineering and Technology, Vol.6, No.4 (Aug-2016)